Skip to main content
. 2020 Jul 3;11:3299. doi: 10.1038/s41467-020-16510-3

Table 5.

Summary of CO2 capture costs for the MgO looping process using costs as defined in the section “Calculating the cost of CO2”.

Grid electricity Solar electricity $0.06 kWh−1 Solar electricity $0.03 kWh−1
Capture cost [$ tCO2−1] 46–151 46–151 43–148
Net removal cost [$ tCO2−1] 48–159 46–152 43–149
Produced cost [$ tCO2−1] 24–79 24–79 23–77