Skip to main content
. 2017 Dec 27;122:1–19. doi: 10.6028/jres.122.044

Table 3.

Uncertainty assessment for the massic activities of 234U, 235U, and 238U in in the natural uranium solution standard SRM 4321d, where u in percent is the relative standard uncertainty for each component. All uncertainty components were evaluated by Assessment Type B, which denotes an evaluation by methods other than statistical methods [6, 7].

Uncertainty component u (%)
234U 235U 238U
1 Uranium mass fraction in CRM 112-A, from CRM 112-A Certificate [5] 0.003 0.003 0.003
2 Isotopic uranium atom fraction in CRM 112-A, from CRM 112-A Certificate [5] 0.077 0.027 1 0.000 20
3 Half-life [4] used for conversion of number of atoms to activity 0.244 0.142 0.112
4 Mass of CRM 112-A uranium metal used 0.05 0.05 0.05
5 Quantitative dissolution of metal 0.05 0.05 0.05
6 Mass of SRM 4321d master solution 0.005 0.005 0.005
Relative combined standard uncertainty, uc 0.261 0.153 0.123
Relative expanded uncertainty (k = 2), U 0.52 0.31 0.25