Skip to main content
. 2020 Jul 9;18:186. doi: 10.1186/s12916-020-01638-2

Fig. 2.

Fig. 2

Distribution of cumulative costs and savings over time in an accelerated (3 years, left panel) and sequenced (10 years, right panel) roll out in Yogyakarta City in 2018 USD. Uncertainty represents uncertainty in programme cost and intervention effectiveness beyond the 10-year post-release time horizon used in this analysis. All costs and benefits are in present-day value 2018 USD discounted at 3% per annum