TABLE 7.
Relative measurement uncertainty using the mathematical model for the five targets.
| Level | Concentration (cp/uL) | Relative uncertainty (%) |
| 1 | 8,000 | 3.6 |
| 2 | 800 | 1.6 |
| 3 | 80 | 3.8 |
| 4 | 8 | 9.0 |
Data correspond to an average value.
Relative measurement uncertainty using the mathematical model for the five targets.
| Level | Concentration (cp/uL) | Relative uncertainty (%) |
| 1 | 8,000 | 3.6 |
| 2 | 800 | 1.6 |
| 3 | 80 | 3.8 |
| 4 | 8 | 9.0 |
Data correspond to an average value.