Table 11.
Final model for the electrical contractors (number of remaining accidents = 566).
Accident Factor | Model Parameters | Coefficient | Std. Err. | z | p |
---|---|---|---|---|---|
Constant | 1.862 | 0.786 | 2.369 | 0.018 * | |
SoI | Machinery | −0.733 | 0.445 | −1.646 | 0.100 † |
Parts and materials | −0.764 | 0.336 | −2.276 | 0.023 * | |
Structures and surfaces | −1.247 | 0.381 | −3.272 | 0.001 ** | |
Tools, instruments, and equipment | −1.613 | 0.381 | −4.235 | 2.29 × 10−5 *** | |
Other | −1.072 | 0.545 | −1.966 | 0.049 * | |
PT | Alteration or rehabilitation | −0.607 | 0.651 | −0.933 | 0.351 |
New project or new addition | −0.635 | 0.629 | −1.009 | 0.313 | |
Maintenance or repair | −1.082 | 0.637 | −1.699 | 0.089 † | |
Other | −2.456 | 0.751 | −3.268 | 0.001 ** | |
CoI | Installing equipment (HVAC and other) | 0.445 | 0.435 | −1.023 | 0.306 |
Installing plumbing, lighting fixtures | −0.420 | 0.476 | −0.883 | 0.377 | |
Interior plumbing, ducting, electrical work | −1.032 | 0.450 | −2.290 | 0.022 * | |
Temporary work (buildings, facilities) | −0.389 | 0.526 | −0.740 | 0.459 | |
Other | −0.735 | 0.421 | −1.748 | 0.081 † |
Significance levels: 0–0.001: ***; 0.001–0.01: **; 0.01–0.05: *; 0.05–0.1: †. HVAC: heating, ventilation, and air conditioning.