Skip to main content
. 2010 Jan 20;2010(1):CD006094. doi: 10.1002/14651858.CD006094.pub2
Study Intervention Outcome Mean pre (SD) Mean post Mean post minus mean pre Relative % change pre to post SMD pre to post mean change in level (P value) mean change in slope (P value)
Feldstein 2007 Organisational + reminder + financial BMD test 72 129.5 57.5 79.9 N/A 16.8 (p=0.07) 5.6 (p <0.0001)