Skip to main content
. 2020 Aug 5;18(8):e06226. doi: 10.2903/j.efsa.2020.6226

Table A.1.

Technical Data of the Equipment Used

Factors Tunnel Composting
Tunnel The tunnel will be of concrete or other non‐corrosive construction as an enclosed vessel
Water content at start‐up in the feedstock mixture 50–65%
Watering As required during the process. During the post‐hygienisation phase, only clean water can be added
Ventilation Forced aeration is provided by an aeration floor beneath the mass in the tunnel. The warm air is recirculated
Turning Equipment Front end loader in order to load and unload the tunnels. Automatic filling system
Temperature during hygienisation Standard 1: 55°C; Standard 2: 60°C
Temperature Monitoring Temperature should be monitored to ensure that it is representative of the temperatures within the composting mass