Skip to main content
. 2020 Jul 1;9(7):2071. doi: 10.3390/jcm9072071

Table 2.

Hierarchical multiple regression predicting the pre–post change in cognitive performance.

Step 1 Step 2
Variables β 95% CI β 95% CI
Group 0.09 * 0.04 to 0.15 0.09 * 0.04 to 0.14
Baseline Performance −0.57 * −0.064 to −0.50 −0.56 * −0.63 to −0.48
Baseline Performance2 0.06 * 0.002 to 0.13 0.10 * 0.02 to 0.17
EF Condition −0.17 * −0.22 to −0.11 −0.17 * −0.23 to −0.11
Group × Baseline Performance −0.07 * −0.14 to −0.003
Group × Baseline Performance2 0.03 −0.03 to 0.09
Group × EF Condition −0.03 −0.08 to 0.03
Baseline Performance × EF Condition 0.07 * 0.008 to 0.14
Baseline Performance2 × EF Condition −0.003 −0.08 to 0.07
ΔR2 0.33 * 0.01 *

Note: Cognitive performance was converted to z-score after controlling for age and sex in each study; group is coded as control = 0, intervention = 1; EF condition is coded as lower EF condition = 0, higher EF condition = 1; CI = confidence interval; * p < 0.05. Step 3 did not reach significance (ΔR2 = 0.002, p = 0.30). Baseline Performance2 = square value of Baseline Performance.