Skip to main content
. 2020 Jul 12;20(14):3883. doi: 10.3390/s20143883

Figure 5.

Figure 5

Scheme of test setup and instrumentation: (a) beam dimensions and reinforcement, (b) instrumentation on the front side and (c) instrumentation on the back side; dimensions in mm; the critical fictitious cracks 1 and 2 are marked.