Table 1. Average processing time for each component of the pipeline.
Stage | Average time |
---|---|
i. hardware setup | variable |
ii. image capture | 20 minutes |
iii. image processing | 20 minutes |
iv. alignment/mesh reconstruction | Reality Capture: 20–30 minutes |
v. manual mesh processing | 5 minutes |
vi. procedural mesh processing | 5–10 minutes |
vii. texture generation | 10 minutes |