Cost of deploying targets

Item (percentage of two years’ total costs) 2015
(USD)
2016
(USD)
Specialised equipment (25.8%)
   Targetsa 3000 3000
   Target insurance and freight 1050 930
   Target assembly and fixing: cutting up 12,000 sticks and assembling of targets 506 101
   String, wire and glue 452 295
Transport (14.4%)
   Vehicle hire 1973 2108
   Fuel 422 547
   Canoe hire (5 days, from several jetties) 84 84
Staff (43.0%)
   Share of staff salaries 3188 3895
   Travel allowances 3744 4755
Local labour (3.8%)
   Supervisor, guard 110 599
   CSSEs incentive payments 658
Administrative support (9.1%) 1599 1698
Consumables and equipment (3.9%)
   GPS sets (depreciation) 68 68
   GPS sets batteries 101 51
   Fuel for generator 49 74
   Digital camera (depreciation) 105 105
   Stationery (markers, batteries, etc.) 68 9
   Machetes (depreciation, 2 year life) 253 253
   Sundries, including internet 84 134
Total 16,856 19,364
Cost per km2 protected 20.1 23.1

aThe number of targets actually deployed in 2015 and 2016 was 2708, as numbers were slightly increased from the original number of 2600 deployed in 2014 [21]. However, as 3000 targets were ordered, assembled, and paid for each year the full number is included here