Skip to main content
. 2020 Aug 14;13:419. doi: 10.1186/s13071-020-04286-w

Table 7.

Summary of costs for one year’s tsetse control by activity

Activity Average per year (USD) % of expenditure USD/km2 protected
Initial tsetse surveya 7182 12.8 8.6
Preliminary sensitisationa 2220 4.0 2.6
Tsetse monitoring 22,741 40.6 27.1
Target deployment 18,082 32.3 21.6
Target checking 2538 4.5 3.0
Sensitisation 3270 5.8 3.9
Total 56,133 100.0 66.8

a20% of the cost of these preparatory activities is attributed to each year’s tsetse control operation