Skip to main content
. 2020 Aug 4;13(15):3437. doi: 10.3390/ma13153437

Table 7.

Slump value of concrete samples. CM: control mixture of cement; BM: control bagasse ash mixture.

Sample Name W/C Ratio Slump (mm)
CM 0.5 91.44
BM 0.5 97.27
G8N208K80 0.5 104.20
G8N408K60 0.5 101.60