Table 4.
Study Period (1st March – 18th April 2020) | Fire counts | FRP (MW) |
---|---|---|
Before Lockdown | ||
Before Lockdown Week-1 | 6661 | 39904.7 |
Before Lockdown Week-2 | 13360 | 346149.5 |
Before Lockdown Week-3 |
19405 |
269819.4 |
During lockdown | ||
During lockdown Week-1 | 19003 | 200400.8 |
During lockdown Week-2 | 37051 | 305118.5 |
During lockdown Week-3 | 26020 | 155986.9 |
During lockdown Week-4 | 32887 | 207487.9 |