Skip to main content
. 2020 Aug 21;208:800–813. doi: 10.1016/j.solener.2020.08.041

Table 2.

The capital, replacement, and operation and maintenance costs for solar PV in countries near Sudan.

Reference Country Costs
Capital (USD$/kW) Replacement (USD$/kW) Operational and maintenance (USD$/kW)
Olatomiwa et al. (2015) Nigeria 2500 2000
Diab et al. (2016) Egypt 3000 2250 10
Ramli et al. (2016) Saudi Arabia 2000 1200 30
Maatallah et al. (2016) Tunisia 1382.58 0 88.48
Issak (2018) Chad 3000 2000 1
Gebrehiwot et al. (2019) Ethiopia 1500 1000 50
Abdul-Wahab et al. (2019) Oman 1504 1316 19