Skip to main content
. 2020 Aug 26;20:490. doi: 10.1186/s12884-020-03165-7

Fig. 3.

Fig. 3

IPTB risk nomogram. Legend: Each predictor is assigned a score on each axis. The sum of all points for all predictors is computed and denoted as the total score. The risk of IPTB for the total score was converted to a probability of GDM