Skip to main content
. 2020 Jul 9;11(8):4110–4129. doi: 10.1364/BOE.394914

Fig. 2.

Fig. 2.

A timing diagram of the dual integration data acquisition scheme. Integration A corresponds to the short integration period (0.5 ms) and B, the long integration period (6.3 ms). The LED overlap time τovp can be optimized on a subject-by-subject basis.