Table 2.
Model specification | LR, p-value | BCV AUROC (%) | BCV BS(%) | RMSE | R2 |
---|---|---|---|---|---|
Standard model (S) | 5.34, 0.7209 | 51.0 | 12.0 | 0.35 | 0.01 |
Spline model | 8.08, 0.8387 | 49.0 | 11.0 | 0.33 | 0.10 |
Slope corrected optimism model (SCFM) | 7.32,0.7844 | 49.0 | 11.0 | 0.33 | 0.10 |
PMLE model | 5.76, 0.7360 | 50.0 | 10.0 | 0.32 | 0.17 |
LR: Likelihood Ratio test statistic; BCV: Bootstrap cross-validation; RMSE: Root Mean Squared Error; R2: Proportion of explained variation in predicted risk; AUCROC: Area Under the Receiver Operating Characteristic curve, BS: Brier score