Skip to main content
. 2020 Aug 27;101(3):1889–1899. doi: 10.1007/s11071-020-05901-2

Table 3.

Influence of four different late easing measure on daily confirmed cases for the second peak where q1 = 0.1

Period of the easing control measures Maximum of the second peak Date for maximum of the second peak Ratio of maximum of the second peak to the first peak
April 16-April 26 22,649 May 10 2.560
April 19-April 29 14,666 May 13 1.658
April 21-May 01 10,981 May 15 1.241
April 24-May 04 7156 May 18 0.809