Fig. 6.
Training process of Wide ResNet. Keep in mind that the validation accuracy (the green and red line) are the metrics that ultimately matters
Training process of Wide ResNet. Keep in mind that the validation accuracy (the green and red line) are the metrics that ultimately matters