Skip to main content
. 2020 Aug 29;25:234–247. doi: 10.1016/j.spc.2020.08.011

Fig. 4.

Fig. 4

Higher end of the expected ramp up speed of H2 SCP production in terms of caloric requirements fulfilled over time, obtained from the lower CapEx values. The results shown are for gasification and electrolysis when using the budget of similar industries, including regular and fast construction speeds.