Skip to main content
. 2020 Aug 29;25:234–247. doi: 10.1016/j.spc.2020.08.011

Fig. 6.

Fig. 6

Expected ramp up speed of H2 SCP production in terms of global protein requirements fulfilled over time, obtained from the averages of the ranges of CapEx values and an average protein content. The results shown are for gasification and electrolysis when using the budget of similar industries, including regular and fast construction speeds.