Skip to main content
. 2020 Aug 29;25:234–247. doi: 10.1016/j.spc.2020.08.011

Table 10.

Retail cost of H2 SCP for different fast construction cost scenarios in $/kg SCP.

Low CapEx & OpEx High CapEx & OpEx
Plant lifetime 6 years 20 years 6 years 20 years
Electrolysis $6.00 $4.04 $16.24 $12.14
Gasification $6.70 $3.70 $10.16 $5.98