Chang et al. [36] |
Expendable |
– |
Stochastic |
To minimise transportation cost, facility set up cost, equipment cost |
Exact method |
|
Balcik et al. [37] |
Expendable |
Known |
Stochastic |
To maximise total expected demand |
Exact method |
|
|
Huang et al. [45] |
Expendable |
Unknown |
Deterministic |
To minimise total travel time, sums of arrival times and unsatisfied demand |
Heuristic method |
|
Falasca and Zobel [40] |
Non-expendable |
– |
Deterministic |
To minimise cost of task shortage, total number of undesired tasks and time blocks |
Exact method |
|
Lee et al. [3] |
Both |
Known |
Deterministic |
To minimise total weighted tardiness |
Heuristic method |
|
|
Wex et al. [15] |
Non-expendable |
Unknown |
Deterministic |
To minimise total weighted completion times |
Heuristic method |
|
|
Schryen et al. [42] |
Non-expendable |
Unknown |
Stochastic |
To minimise total weighted completion times |
Heuristic method |
|
|
Lei et al. [1] |
Both |
Known |
Deterministic |
To minimise total weighted tardiness |
Heuristic method |
|
|
Caunhye et al. [47] |
Expendable |
Unknown |
Stochastic |
To minimise cost of setting up warehouse, total response time |
Exact method |
|
|
Shahparvari and Bodaghi [44] |
Both |
Known |
Deterministic |
To minimise operational costs of the vehicle fleet |
Heuristic method |
|
|
Bodaghi et al. [48] |
Both |
Unknown |
Probabilistic |
To minimise weighted completion time |
Exact method |
|