Table 6.
Formulas used to calculate peak timing from an estimate of phase shift , harmonic regression estimates of and , and the length of the annual cycle M.
Quadrant | Peak Timing |
---|---|
|
|
|
|
|
|
|
Formulas used to calculate peak timing from an estimate of phase shift , harmonic regression estimates of and , and the length of the annual cycle M.
Quadrant | Peak Timing |
---|---|
|
|
|
|
|
|
|