Table 7.
Planned grid reinforcement added between 2019 and 2020.
| Reinforcement | 2019 | Horizon end of 2020 |
| • Installation of a third transformer of 400/225 kV • Installation of a third autotransformer of 400/225 kV • Setup of a 3-phase line of 400 kV (55 km) • Setup of a 3-phase line of 400 kV (400 km) |
• Setup of a 3-phase line of 400 kV (300 km) • Setup of a 3-phase line of 400 kV (300 km) • Setup of a 3-phase line of 400 kV • Addition of a new post of 400/225 kV • Replacement of a 225/60 kV transformer by a 400/225 kV transformer. |