Figure 6.
Predicted shift in wake-up times as a result of applying the optimal lighting schedules. (a) Employee 1 wake-up time is shifted by ~15 min; (b) employee 2 wake-up time is shifted by ~38 min; (c) employee 3 wake-up time is shifted by ~12 min; (d) employee 4 wake-up time is shifted by ~45 min.
