Skip to main content
. 2019 Dec 18;18(2):112–117. doi: 10.1080/2090598X.2019.1702242

Figure 1.

Figure 1.

The step-by-step ffURS procedure: (a, b, c) The measurement of ureteric length for insertion of the ureteric access sheath after the semi-rigid URS. (d) Insertion of the ureteric access sheath over the guidewire. (e) Control of the ureteric access sheath placement with the urine drainage from the renal pelvis.