Skip to main content
. 2020 Sep 11;185:102948. doi: 10.1016/j.agsy.2020.102948

Fig. B2.

Fig. B2

Data validation of 83 maize plots for DSSAT process-based data (in Black PDFs) vs. 500 iterations bio-economic simulated data (in Red) in the semi-arid zone. (For interpretation of the references to colour in this figure legend, the reader is referred to the web version of this article.)