Skip to main content
. 2020 Sep 15;10:15065. doi: 10.1038/s41598-020-72137-w

Figure 5.

Figure 5

ABM in predicting adoption peaks in towns. (A) Prediction Error in town i is the peak month predicted by the ABM minus the month of empirical peak. Negative Prediction Error denotes early prediction and positive means late prediction. (B) Correlation of Prediction Error of ABM (h = 0.0, l = 0.0) and ABM (h = 0.2, l = 0.2) (ρ=0.39, CI [0.36; 0.43]). (C) Estimation of town-level Prediction Error of ABM versions via a simple linear regression. Independent variables are characteristics from networks within towns and geographical characteristics of towns. Symbols represent point estimates and horizontal lines denote standard errors.