Skip to main content
. 2020 Jun 16;39(21):2714–2742. doi: 10.1002/sim.8570

Table 2.

ICI, E50, and E90 in simulations with a model with an interaction

RCS Hazard regression
Sample size Percentile of event time ICI E50 E90 ICI E50 E90
500 10 0.005 0.005 0.008 0.009 0.008 0.014
500 25 0.012 0.011 0.019 0.015 0.013 0.025
500 50 0.018 0.017 0.032 0.019 0.017 0.032
500 75 0.017 0.016 0.030 0.019 0.017 0.031
500 90 0.012 0.010 0.020 0.013 0.011 0.023
1000 10 0.004 0.004 0.006 0.007 0.006 0.012
1000 25 0.009 0.009 0.016 0.012 0.011 0.020
1000 50 0.014 0.014 0.026 0.015 0.013 0.025
1000 75 0.014 0.013 0.024 0.016 0.015 0.026
1000 90 0.010 0.008 0.016 0.011 0.010 0.019
10 000 10 0.003 0.003 0.005 0.007 0.005 0.011
10 000 25 0.007 0.007 0.012 0.010 0.008 0.017
10 000 50 0.011 0.010 0.020 0.008 0.007 0.015
10 000 75 0.011 0.010 0.019 0.010 0.009 0.018
10 000 90 0.007 0.006 0.012 0.010 0.010 0.018
True value of ICI, E50, and E90
Percentile of event time ICI E50 E90
10 0.007 0.005 0.009
25 0.011 0.009 0.018
50 0.008 0.007 0.011
75 0.008 0.005 0.013
90 0.010 0.010 0.017