Skip to main content
. Author manuscript; available in PMC: 2020 Sep 17.
Published in final edited form as: Stat Interface. 2020;13(4):533–549. doi: 10.4310/sii.2020.v13.n4.a10

Table 1.

Baseline and follow-up assessment schedule by study

Time in months (0 = baseline)
Study 0 1 2 3 4 5 6 7 8 9 10 11 12
1 X X X
2 X X X
8a X X
8b X X
8c X X
9 X X X
10.1 X X
11 X X X
12 X X X X
13/14 X X X X
18 X X X
20 X X
21 X X X X
22 X X

Notes. “X” indicates that baseline or follow-up outcome data exist at that time.