Skip to main content
. 2020 Jun 3;49(11):1820–1837. doi: 10.1007/s13280-020-01345-5

Table 3.

Relative and absolute removal of nitrate–N, total phosphorus (TP) and total suspended solids (TSS) based on raw data and the meta-analysis for free water surface constructed wetlands (FWS), denitrifying bioreactors (DBR), controlled drainage (CD) and saturated (SBZ) and integrated buffer zones (IBZ). Kam is the number of study sites included when calculating the arithmetic mean, and Kmeta is the number of study sites included in the meta-analysis

Drainage mitigation measure Kam% Kmeta Removal Mean ± SD (%) Removal Meanmeta ± SD (%) Kam Removal Mean ± SD (g m−2 year−1)
Nitrate–N
 FWS 18 14 40 ± 17 41 ± 21 21 60 ± 69
 DBR 19 12 44 ± 21 40 ± 27 2 594 ± 481
 CD 20 19 48 ± 18 50 ± 20 6 1 ± 1
 SBZ 6 68 ± 39 13 23 ± 18
 SBZa 6 37 ± 25
 IBZ 2 26 ± 4 19 140 ± 50
TP
 FWS 16 15 18 ± 46 33 ± 28 8 0.68 ± 4.19
 CD 7 7 29 ± 26 34 ± 32 2 0.03 ± 0.03
 DBR 3 -50 ± 136 3 − 5.79 ± 20.96
 IBZ 2 48 ± 6 20 2.44 ± 0.76
SS
 FWS 6 41 ± 16 6 1555 ± 936

aIncludes the water and nitrate–N bypassing the SBZ