Skip to main content
. 2020 Aug 21;20(17):4732. doi: 10.3390/s20174732

Figure 2.

Figure 2

Acoustic equipment deployment in the farm H1. On the left, the recorder location. On the right, the microphone hanging from the ceiling in order to avoid physical interaction with the birds.