Skip to main content
. 2020 Aug 21;20(17):4732. doi: 10.3390/s20174732

Figure 6.

Figure 6

Map of the Leq at 30 min intervals during the 44 days of a complete production cycle. The red rectangles correspond to the areas where there is a high Leq measurement due to machinery.