Skip to main content
. 2020 Sep 21;5(9):e002381. doi: 10.1136/bmjgh-2020-002381

Table 3.

Average cost of PBF indicators in control and treatment groups per health facility per year (US$ 2015)

Cost centres ANC cost (US$) SBA cost (US$) PNC cost (US$) Cost per HF (US$)
Control Treatment Control Treatment Control Treatment Control Treatment
Salary 607 867 460 658 419 598 1486 2123
Incentive 0 4345 0 10 170 0 2353 0 16 868
Data verification 0 214 0 214 0 214 0 642
Building 150 214 243 348 108 154 501 716
Equipment 32 46 44 63 25 36 101 145
Drug 22 32 15 22 12 17 49 71
Transport 0.8 1.2 29 41 0 0 30 43
Cost per health facility 812 5719 792 11 515 564 3373 2168 20 607

ANC, antenatal care; PBF, performance-based financing; PNC, postnatal care; SBA, skilled birth attendance.