Skip to main content
. 2020 Sep 22;15(9):e0238422. doi: 10.1371/journal.pone.0238422

Fig 5. A schematic diagram showing the adaptive design process over four years.

Fig 5

Green rectangles indicate new sites (i.e. sampling locations) that have been added to the monitoring program, and blue rectangles indicate that sites have been retained from previous years.