Skip to main content
. 2020 Jul 14;66(4):827–849. doi: 10.1007/s00466-020-01876-4

Table 3.

The elapsed CPU time for the estimation of the load-displacement diagram (with the reference values) until the failure point in SENT

Mesh size h=1/20 h=1/40 h=1/80 h=1/160 h=1/320
CPU time [s] 10 23 1428 4810 15 854