Skip to main content
. 2020 Sep 28;89:101886. doi: 10.1016/j.jairtraman.2020.101886

Fig. 5.

Fig. 5

Microscopic resource scheduling model for cabin cleaning with precedence constraints (left) and two potential resource allocation schemes (right). Note the setup periods when an agent changes between two activities of a different kind.