Skip to main content
. 2020 Sep 19;55(9):885–892. doi: 10.4085/1062-6050-500-19

Figure 3.

Figure 3

Operational framework integrating the training process, monitoring, and control of the training load for injury prevention. Path A represents the adjustment of the training load using information from monitoring but based on training principles. Path B represents the adjustment of load based on the injury risk derived from previous studies.