Skip to main content
. 2020 Oct 9;230:110532. doi: 10.1016/j.enbuild.2020.110532

Table 9.

Zone ventilation schedule for weekdays during the month of March 2020.

Floor Room AW(D) [m2] CD Ventilation [h]
I II III
1 LR 1.76 S 10:20–10:25 16:00–16:05 19:30–19:35
K1 1.68 E 10:30–10:35 16:00–16:05 19:30–19:35
BA1 0.36 N 10:10–10:15 16:00–16:05 19:30–19:35
H1 2.94 S 10:40–10:45 16:00–16:05 19:30–19:35
BR1 1.68 N 10:00–10:05 16:00–16:05 19:30–19:35
H3 0.96 W 10:50–10:55 16:00–16:05 19:30–19:35
LOC



2 BR2 1.76 S 11:05–11:10 17:32–17:37 19:32–19:37
BR3 1.76 N 11:10–11:15 17:32–17:37 19:32–19:37
BA2 0.36 N 11:20–11:25 17:32–17:37 19:32–19:37
H2 3.26 N 11:50–11:55 17:32–17:37 19:32–19:37
K2 1.76 N 11:30–11:35 17:32–17:37 19:32–19:37
BR4 1.76 S 11:40–11:45 17:32–17:37 19:32–19:37



3 AS