Table 6.
Parameter | Mean ± SE 1 | Median | Coef 2 | T-Value | p-Value |
---|---|---|---|---|---|
Working hours/day | 6.23 ± 0.19 | 6.0 | −0.32 | −2.75 | 0.016 * |
Number of donkeys | 8.95 ± 0.60 | 7.5 | 0.22 | 4.20 | 0.001 ** |
Distance | 54.70 ± 3.53 | 53.5 | −0.02 | −2.40 | 0.031 * |
Concrete amount/donkey | 2.52 ± 0.20 | 2.15 | 0.48 | 4.85 | 0.000 ** |
1 SE = standard error of the mean, * means significant at the 5% significance level, and ** means significant at the 1% significance level, 2 Coef = coefficient value