Assessment of PANOS according to the Development Model for Integrated Care (DMIC) framework (A): Illustrative summary of the Developmental Model of Integrated Care (DMIC). A total of 89 components relevant to ICC implementation are grouped into 9 clusters and located on a cluster map with 4 axes (Organization of care, Quality care, Results and Effective collaboration). The model also considers 4 developmental stages ranging from phase 1—initiative and design phase, to phase 4—consolidation and transformation phase. (B): Current assessment of PANOS by 6 involved key representatives according to which elements already have been achieved (rated as “present”, shown in red) and how PANOS would represent the model if planned activities are implemented (rated as “planned or present”, shown in blue). (C): PANOS is still in an early maturation state. Achieved elements belong to phase 1 and 2; the percentage of relevant elements already planned but not yet achieved is much higher for phases 1 and 2 (90% each) than for phase 3 (60%) and phase 4 (40%). Reproduced with permission from Mirella Minkman, Journal of Integrated Care; published by Emerald Publishing Pty Limited, 2016.