Skip to main content
. Author manuscript; available in PMC: 2021 Nov 1.
Published in final edited form as: Prev Sci. 2020 Nov;21(8):1114–1125. doi: 10.1007/s11121-020-01162-y

Table 1.

Unit costs used in the cost analysis, all in 2015 USD

Cost category Unit Cost Source
GTO technical assistance supervisor time per hour $46.68 Estimated 2015 Employer Cost of Employee Compensation for a “Social and Community Service Managers” (11–9151)a
GTO technical assistance staff time per hour $29.83 Estimated 2015 Employer Cost of Employee Compensation for a “Community and Social Service Specialists, All Other” (21–1099)b
BGC staff time per hour $20.97 Estimated 2015 Employer Cost of Employee Compensation for a “Social and Human Services Assistant” (21–1093)c
Transportation cost per mile $0.575 US General Services Administration 2015 rates for privately owned automobilesd
Lodging and per diem per overnight stay $137.00 US General Services Administration 2015 rates for Huntsville, ALe
MPC materials needed at each site $571.77 ETR website (MPC is an ETR product) for the curriculum and teacher setf,g
Condom demonstration (10) and contraception kits (1) for each site $238.28 Total Accessg,h for the condom demonstration models and Planned Parenthoodg,i for the contraception kits
MPC workbooks for each student $3.07 ETR website (MPC is an ETR product)f,g

GTO = Getting to Outcomes implementation support system; BGC = Boys and Girls Club; MPC = an evidence-based program to prevent teen pregnancy and sexually transmitted infections in youth.

a

Found at: https://www.bls.gov/oes/2015/may/oes119151.htm. Accessed 11/27/17.

b

Found at: https://www.bls.gov/oes/2015/may/oes211099.htm. Accessed 11/27/17.

c

Found at: https://www.bls.gov/oes/2015/may/oes211093.htm. Accessed 11/27/17.

g

The 2019 prices available on the website were adjusted to 2015 prices based on Consumer Price Index: https://data.bls.gov. Accessed 6/19/19.