Skip to main content
. 2020 Oct 23;66(6):1085–1104. doi: 10.1007/s00267-020-01375-5

Table 7.

Data and calculation of quantitative techno-economic criteria for (a) solid waste treatment and (b) wastewater treatment

(a) SW1 SW2 SW3 SW4 SW5
External cost (CEC1) in $/kg 0.018 0.173 0.061 0.079 0.102
Operation cost (CEC2) in $/kg 0.542 0.959 0.998 1.201 1.041
Financial profit (CEC3) in $/kg 0.356 0.037 0.295 0.119 0.097
Job creation (CSP1) in 106MH/year 59.42 61.83 60.51 66.48 76.18
(b) WW1 WW2 WW3 WW4 WW5
External cost (CEC1) in $/kg 1.71 1.52 1.74 2.11 1.69
Operation cost (CEC2) in $/kg 31.76 28.92 45.18 6.96 72.07
Financial profit (CEC3) in $/kg 15.61 6.11 7.81 9.42 3.29
Job creation (CSP1) in 106MH/year 1.15 0.96 1.42 0.11 1.01