Table 1.
Dependent variable | |||||||
---|---|---|---|---|---|---|---|
Lead-time () | |||||||
(1) | (2) | (3) | (4) | (5) | (6) | (7) | |
1.916*** | 2.566*** | 4.644 | 1.590*** | − 2.276 | |||
(0.345) | (0.664) | (4.531) | (0.593) | (4.016) | |||
Social ties | − 3.222*** | − 2.753*** | − 2.310*** | − 1.476*** | − 1.367*** | ||
(0.271) | (0.286) | (0.372) | (0.315) | (0.334) | |||
− 0.617*** | − 0.660*** | − 0.412** | − 0.453** | ||||
(0.238) | (0.243) | (0.206) | (0.211) | ||||
− 3.567*** | − 1.125 | − 1.744*** | − 2.139*** | ||||
(0.527) | (0.720) | (0.490) | (0.637) | ||||
− 0.267 | 0.583 | ||||||
(0.679) | (0.599) | ||||||
8.516*** | 8.763*** | ||||||
(1.135) | (1.163) | ||||||
2.818*** | 2.762*** | ||||||
(0.599) | (0.602) | ||||||
Constant | − 8.571*** | 3.766*** | 1.610 | 16.287*** | 7.441* | − 22.169*** | − 19.291** |
(0.470) | (1.007) | (1.104) | (3.523) | (4.121) | (7.068) | (7.662) | |
Observations | 306 | 306 | 306 | 306 | 306 | 305 | 305 |
R2 | 0.092 | 0.318 | 0.357 | 0.131 | 0.368 | 0.535 | 0.537 |
Adjusted R2 | 0.089 | 0.316 | 0.351 | 0.128 | 0.358 | 0.526 | 0.526 |
Residual SE | 7.356 (df = 304) | 6.376 (df = 304) | 6.211 (df = 302) | 7.196 (df = 304) | 6.176 (df = 300) | 5.312 (df = 298) | 5.312 (df = 297) |
F statistic | 30.820*** (df = 1; 304) | 141.645*** (df = 1; 304) | 55.885*** (df = 3; 302) | 45.859*** (df = 1; 304) | 34.999*** (df = 5; 300) | 57.218*** (df = 6; 298) | 49.170*** (df = 7; 297) |
AIC | 2093.70 | 2006.20 | 1992.24 | 2080.25 | 1990.93 | 1893.62 | 1894.77 |
*p **p ***p < 0.01.