Skip to main content
. 2020 Jun;20(2):568–578. doi: 10.4314/ahs.v20i2.4

Table 9.

PMG short-run estimate, ΔHPREV is the dependent variable

Variable Coefficient Standard Error
ECT −0.60*** 0.10
Δ(HPREV(−1)) 0.18*** 0.07
Δ(ANS) 0.022*** 0.009
Δ(ANS(−1)) 0.016*** 0.006
Δ(ANS(−2)) 0.001 0.012
Δ(HEX) 0.87** 0.37
Δ(HEX(−1)) −0.29 0.65
Δ(HEX(−2)) −1.34 0.96
Constant 3.46*** 0.54

Note: ***, ** and * indicate 1% and 5% significance level respectively.