Table 2. Survey Versions Used.
SV/Position | 1 | 2 | 3 | 4 | 5 | 6 |
---|---|---|---|---|---|---|
V1 | noL-1R-A | L-3R-B | noL-0R-C | L-1R-D | noL-0R-E | L-3R-F |
V2 | noL-0R-F | L-1R-E | noL-3R-D | L-3R-C | noL-1R-B | L-0R-A |
V3 | noL-3R-E | L-0R-D | noL-1R-F | L-0R-B | noL-3R-A | L-1R-C |
V4 | L-0R-E | noL-1R-D | L-1R-A | noL-3R-F | L-0R-C | noL-3R-B |
V5 | L-1R-B | noL-3R-C | L-0R-F | noL-0R-A | L-3R-D | noL-1R-E |
V6 | L-3R-A | noL-0R-B | L-3R-E | noL-1R-C | L-1R-F | noL-0R-D |
Note. SV, survey version; noL, no load; L, load; 0R, no retraction; 1R, one retraction; 3R, three retractions; A-F, event-report scenarios.