Table 3 –

Regression coefficients ([95% confidence interval]) from linear models testing for associations between ACES and Worker Experiences. Models are adjusted for square footage, project cost, project completion percentage, FTEs, and presence of a dedicated onsite safety person.

Worksite ACES Subcontractor ACES
TOTAL 24 43
Safety Climate
Worksite level 0.072 [0.02, 0.12]* 0.002 [−0.018, 0.022]
Subcontractor level 0.052 [0.01, 0.10]* 0.005 [−0.012, 0.023]
OSHA recordable injuries (Per 100 FTEs) −0.11 [−0.24, 0.034] --
DART injuries (Per 100 FTEs) −0.32 [−0.46, −0.18]*** --
*

p<0.05

**

p<0.01

***

p<0.001