Table 2.
Description of MCDM studies in prioritising other fields.
Ref. | Aim of the study | Method used | Criteria used | Case study |
---|---|---|---|---|
[37] | Selection and evaluation of mHealth applications | AHP, fuzzy TOPSIS | User satisfaction, quality of information, compatibility, functionality, security, ease of access, responsiveness, and ease of learning and understanding | Numerical case example for different mHealth applications |
[38] | settlement solution Drawing for an MAGDM problem through HFLTSs | VIKOR, TOPSIS | public approval, waste residuals, released-with-effects of health, reliability, treatment-usefulness, Net-cost-per-tonne | Example rely on the valuation of a health-care waste disposal management system defined in Shanghai, China case study [47] |
[39] | Experimental guide on hospital services’ performance to estimate performance levels' prediction | TOPSIS, Neural Networks | Inputs – TOPSIS criteria Surgical-beds, beds for clinical, life-support equipment, image diagnosis equipment, No. of nurses, No. of physicians, Total No. of professionals | Public hospitals from 92 municipalities of Rio de Janeiro, for a period from 2008 to 2013 |
[40] | -Vulnerability assessment of the health effects caused by climate variation -Validity of the vulnerability assessment results and the occurrence rate of cardiovascular patients |
Fuzzy TOPSIS | Meteorological, air pollution, vulnerable group, vulnerable environment, disease distribution, socioeconomic-capacity, health/medical-capacity, air-pollution control | Climate and air pollution data from South Korea in 2010 |
[41] | Ranking variances between the TOPSIS and other MCDM approaches | TOPSIS | Combined-other-methods, year of publication, publication of journal, nationality of author | 266 papers about TOPSIS applications published since 2000 in 103 journals of scholarly |
[45] | Research priorities ranking for organization of military health | AHP, TOPSIS | Time priority, accordance with organizational goals, applicability and usefulness | Cross-sectional study done in 2013 (clinics of a military health organization in Iran) |
[42] | efficiency estimation of the health information systems in health care services and delivery | AHP-TOPSIS |
|
top 20 of the most used software solutions at the beginning of 2016 (from Electronic Health Record) |
[43] | Selection of Power Plant Site of Inland Nuclear under Z‐numbers | Z -number ‐BWM, Z -number ‐DEMATEL, and Z -number ‐TOPSIS | Eco‐environment, physical geography, socio‐economics | Hunan Province of China |
[44] | Rank the hotel BEER projects | Fuzzy TOPSIS-based QUALIFLEX method, (LD-PFOWA) | Project management, Project nuancing, EPC- innovation, supportable progress, measurement, verification, preparation of workable development strategy, contracting, external economics | Hotel BEER project selection problem for energy service company |
[46] | Manage (Sustainable supplier selection) problems | Picture fuzzy exponential entropy, VIKOR | , environmental and social SSS evaluation criteria | Chemical manufacturing enterprise, China |